Hunt Union Circle Drive Replacement: West Entrance Closed August 1st to 3rd

As most of you know Mancini construction’s concrete sub contractor has to replace the concrete in the Hunt Union entry drive due to improper finish.

Our plan is to remove the concrete on Monday August 1,2016 and reinstall the new rebar.

On Tuesday August 2 the new concrete with proper finish will be installed.

Therefore the West entrance to Hunt Union will need to be closed until Wed Morning.

Signage will be put up to direct the general public to the entrances at the Lower Level of Hunt Union:

1. South Pond entrance to elevator & corridor.
2. Rear door to Service corridor near disabled parking spaces.

Thank you as this will correct the condition before the students return Mid August.

Jim Johnson Site Rep.